Located in the heart of downtown Berkeley, this building is undergoing
an extensive "green" rehab including seismic upgrade. Renovation
to the building will include new energy efficient heating, cooling,
ventilation and lighting design in addition to water efficient
fixtures, operable windows and healthy interior materials. Construction
is estimated to be complete in 2008.
Description
- Four floors, plus penthouse
- 41,000-square-foot office building
- Up to 41,000 square feet presently available
- Architecturally distinctive building
- LEED registered building with the U.S. Green Building Council
Amenities
- Energy-efficient design targeted to beat ASHRAE 90.1 by 25%
- Water-efficient fixtures designed to reduce water usage by 40%
- Operable windows/natural ventilation
- Healthy interior materials
- Extensive daylight/views
Area
- Heart of downtown Berkeley and Arts District
- Two blocks from BART
- Four blocks from UC campus
View New Design (pdf)
 
View Map
 
Space Available
Entire building available upon completion of construction, slated for 2008. View Floor Plans |
 
Broker
| John Gordon |
| P:510-704-1800 |
| For more information: www.2020Milvia.com |
 
Landlord Representatives
| Scott Newman |
| P:510-267-4323 |
 
New Building Design

Interior Lobby Scheme

Roof Garden, looking south

Current building image